Value: One of the Most Confounding Propositions We Face

An overhead electric distribution line crossing bare farmland at sunset

Written by Darin Johnson in 2013 and reprinted here. The argument has not aged: utilities still struggle to show, in terms a finance group or a regulator will accept, that the money they spend on aging infrastructure is worth spending. See also the Economic Life Model and the rest of our published work.

Most electric utility customers have a hard time assessing the value they are receiving from their utility.

John Egan made this point in an article on energy public relations a year ago, and he was right. But the problem goes deeper than he discusses. In many cases it is difficult for even the utility itself, and its regulator, to be sure they are providing value from the customers’ perspective.

One area in which spending decisions are often contentious and confused is refurbishment of aging infrastructure. Almost all electric utilities have asset bases installed mainly in the 1960s and 1970s. There is a sense that spending is needed for pre-emptive replacement, to prevent falling off a cliff at some point in the future. Unfortunately it is difficult to make the case for that spending in a way that resonates with non-technical audiences such as the utility’s finance group and the regulator. The result is often stasis, or a program based on age — this asset has a service life of 40 years and it was installed 40 years ago, therefore it is time to replace — or a worst-case description of risk: if we don’t start spending now, the sky will fall.

Neither is defensible from an economic perspective. Neither makes the case that ratepayers’ interests are being served. Conceptually you would like to make these decisions in cost and benefit terms, replacing or refurbishing assets when the cost to do so is lower than the cost due to risk of failure if they are left in service. Here is one approach that has been implemented and used successfully by utilities.

How long is economic life?

The basis of the approach is calculating the economic life of an asset by quantifying the cost due to risk of failure or technological obsolescence. When deciding whether to replace, you face two competing incentives. On one hand you would like to wait as long as possible, minimizing capital spending. On the other, the longer you leave aging, deteriorating assets in service, the more likely they are to fail, which increases cost due to risk and maintenance. In general there is an optimal service life, the one that minimizes life-cycle cost.

The calculation is done bottom-up, using input data the utility’s asset managers already have, supplemented by technical expertise: asset health and age, consequences of failure in terms of customer effects, expected maintenance cost, and replacement cost. The process is to get subject-matter experts to make reasonable assumptions about each of these, which then become inputs to an analytical model. Importantly, this means asking experts questions they understand well. What is the rate of failure for this asset type? What happens to the customers and the system if this asset fails? What will it cost to replace it?

Those are narrow, focused questions inside the expert’s domain, as opposed to complex economic questions such as how much underground cable should we replace each year, or when is the best time to replace this power transformer. We are maximizing the value of the subject-matter experts by focusing them on what they understand best, and making explicit, quantitative use of that information.

Customer outage costs are used to assess the dollar consequence cost of failure. Probability of failure is usually a function of age and condition, often expressed through a health index. Once we know these, we can quantify risk in dollar terms and identify the point at which the risk of failure is high enough to justify a capital expenditure to replace or refurbish.

Customer outage costs are the hardest input

The idea is to put ourselves, as decision-makers, in the shoes of the customer and ask what their implicit cost is when they lose service. It would be nice if we could simply ask them, but as Egan pointed out, it is probably not possible for them to answer effectively.

Ask yourself: if a representative from your utility knocked on your door and asked how much you would pay to avoid a two-hour outage, could you give a meaningful answer? I know I could not. Yet every utility must spend money on its ratepayers’ behalf to avoid outages, and no answer is not an option. You either will or will not replace a given power transformer, and that decision implies a certain belief about the cost of an outage. Better to be explicit about the assumption, so it can be challenged and improved over time, and so there is consistency across all spending decisions.

In my experience each utility is stuck doing the best it can to settle on a value for customer outage costs. Some take estimates from commercial value models, some use customer surveys, some estimate from judgment. None is perfect, but each is transparent and can be used consistently from the bottom of the budgeting process, estimating remaining life at the asset level, up to top-level prioritization.

Why relative risk scores fall short

It is tempting to quantify risk in relative terms: high, medium, low, or one through ten. There are three problems with this. First, it is not very useful in prioritizing expenditures across asset classes. Second, it does not actually identify the assets for which intervention is justified — how many dollars is it worth to move an asset from high risk to medium? Third, relative measures are opaque to regulators and other parties who need to understand the basis for proposed spending.

Outcomes

The most basic outcome of the economic life process is a long-range projection of the optimal level of spending for each asset class, built from an asset-by-asset assessment of remaining economic life. A year-by-year projection of replacement spending across asset groups typically shows a spike in the first year, covering assets that are already at or past their optimal replacement timing. That spike is then smoothed over several years, and subsequent years pick up assets as they reach the end of their economic life.

Other outcomes include a basis for prioritization that uses the trade-off between risk and capital cost explicitly; projections of maintenance spending and equipment failures; and snapshots of equipment health, age, criticality and risk, which are useful for trending.

Other implications

  • The total level of spending may be higher or lower than in the past, depending on what the utility has been doing. But the approach usually shifts the focus of spending toward more critical and higher-risk assets, even though they may not be the oldest or in the worst condition. Ironically, the best replacement programs are often not at the most important substations serving the most important loads. Those parts of the system usually have high redundancy, which means the consequences of failure are low. Radial systems serving non-critical loads can have very high consequences and are often attractive replacement opportunities.
  • You cannot say that oil circuit breakers have a life of 50 years. What you can say is that this oil breaker, installed at this point in the system and facing this risk of failure, has a life of 50 years, and that one over there, in a non-critical location, has a different life. Service life is asset specific.
  • There is rarely a bow wave of looming replacements. There is often a year-one spike, representing assets that should have been replaced and have not been. That should be less alarming than a bow wave, because it means the utility is already living with the excess risk and knows what it is dealing with. Prioritizing spending to level the spike matters, and the economic life approach shows which replacements are most urgent.
  • Many utilities run aggressive replacement programs for entire asset classes, such as direct-buried cable or aging wood poles. Our experience is that these often have steep diminishing returns: the first replacements are highly cost effective, the last ones may have negative value because those assets were not at end of life. The process is useful first to justify the program by showing the high value of the early replacements, then to manage its scope by showing where to stop.
  • The approach can evaluate the benefit of spares. A spare reduces the consequence of failure, and therefore risk, for multiple assets, extending their economic lives. That benefit can be quantified to show whether spares are needed and how many.
  • It can compare policy options. Many utilities have a policy of replacing direct-buried cable with cable in conduit, or even concrete-encased conduit. A model of this kind compares the life-cycle costs of each policy. The best option from a technical perspective is not always the best from the customers’ perspective.
  • It can group assets. Say the power transformer at a transmission station is at end of life but the breakers have ten years to go. Is it better to do all the work as a single project? If so, now, in ten years, or somewhere in between? The question is whether the extra cost of replacing some assets away from their optimal timing is offset by the advantages of a single outage and a single project.

Where the approach has been used

The economic life approach has been used by public utilities, including municipals, to show themselves and their political overseers that the spending they propose provides net value to stakeholders. It has also been used successfully in rate cases before regulators, where there is often a lot of back-and-forth and testing of assumptions. Having an economic life model lets the utility answer a wide range of questions transparently, which produces a high level of confidence with the regulator and with third-party interveners. Unregulated generators have used it for internal decision-making; they are not answerable to a regulator for their spending, but they are answerable to shareholders.

Does an economic life methodology answer the question Egan raised, how can we show our ratepayers that we are providing value? Perhaps. But it certainly helps answer the question that has to come first: how can we show ourselves that we are providing value?

Darin Johnson is president of BIS Consulting, a Seattle decision support and risk assessment firm. Read more of his published work or get in touch.