Awards and recognition
Recognized work
Two engineering awards, a peer-reviewed publication and a working-group lead convenor. The pattern that matters: the recognition lands with the utilities and agencies who own the decisions.

The awards
Two awards, one pattern
Both were given for decisions rather than drawings, and in both cases the recognition went where it belongs: to the utility and the agency who had to defend the spend. That is the outcome we work toward.
PNWS-AWWA Engineering Committee
Excellence in Engineering — Best Engineering Planning Project
Tacoma Water Strategic Main Replacement ProgramTacoma Water with BIS Consulting, LLC
The project used economic modeling to identify the “right money, on the right mains, at the right time.”
Water mains were chosen for replacement on risk, life-cycle cost and net present value rather than age alone. We built the utility an economic model and a multiple-asset decision module that interfaced directly with ArcGIS, so the analysis ran against the pipe network the utility already maintained.
Washington State Department of Transportation
Leadership in Management Award
Nicole McIntosh, P.E.Design Engineering Manager, Washington State Ferries
Recognized for developing an asset management system so the agency could make better-informed decisions about scarce resources.
The citation also credits Nicole with leading the Trestle Seismic Study, which applied asset management principles to the ten remaining sixty-year-old timber trestles and produced a prioritized work plan recommending a mix of replacement, retrofit and deferral. The award is Nicole’s. The asset management system and the seismic prioritization behind it are work BIS Consulting built with the ferries team.
At the podium
Taking the argument into the room
A method only spreads if somebody explains it out loud and then stands there while it is questioned. Darin presents this work at industry conferences, in front of the engineers and planners who have to live with the answer.



Speaking and training are part of the same argument as the published work: the goal is for a utility to be able to run the method without us. See training and knowledge transfer.
Also on the record
Published, cited and asked to lead
Awards are one signal. Peer-reviewed publication, and a seat at the table where methodology gets argued over, are steadier ones.
Ask us for a reference
Tell us which sector you are in and what decision is in front of you, and we will put you in touch with someone who has been through it with us.
Talk to us